Timeline
DATE MILESTONE
9/26/2016 Discussion with Dr. Dutta
9/30/2016 Project Planning
10/2/2016 Working on the proposal
10/3/2016 P.1. Phase 1 Topology with GENI
10/6/2016 Proposal submitted
10/8/2016 M.3. Researching sk_buff data structure
10/14/2016 R.1. Troubleshooting Phase 1
10/20/2016 P.1. OpenFlow switch for Phase 1
10/23/2016 K.1. Creating a customized TOS hook
10/29/2016 K.2. Testing TOS hook for Phase 1
10/29/2016 M.2. Studying Linux Queue discipline/queue management
10/29/2016 Interim Report documentation begins
11/1/2016 P.2. Created a GENI network for Phase 2 Topology
11/3/2016 P.4. Troubleshooting GENI for Phase 2 Topology
11/5/2016 M.1. Creating a customized TOS hook
11/9/2016 K.3. Testing TOS hook for Phase 2.
11/12/2016 R.6. Create a GENI network for the Final Topology
11/13/2016 Interim Report submission
11/15/2016 P.7. Write post boot script to configure the network topology in GENI
11/16/2016 K.4. Continued development and testing for the ToS hook.
11/16/2016 M.4. kernel module for the set-back router
11/17/2016 Final report documentation begins
11/18/2016 R.4. Make the FTP connection work
11/21/2016 P.6. Simulating various levels of traffic
11/22/2016 M.5. K.6. IF NEEDED, alternative queue management
11/26/2016 R.5. Achieve faster transmission of FTP packets
11/27/2016 Final report submission
11/27/2016 P.5. Optimize QoS kernel modules
11/29/2016 Project Demo